OptimizeSite intelligence

Know where to build before you commit.

Cyclops rates any location for a new datacenter from 0 to 10, from open data on power, climate, people, policy, government support and risk. Compare up to three places, narrow 2,900 candidate sites worldwide to a shortlist, or draw a region and get its five best sites.

12345AREA STUDY400 points · 5 sites
Compare · 3 locationsExample from the demo
Oslo8.7Excellent
Frankfurt7.5Strong
Dublin7.2Strong
Who uses it

Everyone who decides where a datacenter should go. See the whole ecosystem

  • Builders and developersRate, compare and shortlist locations worldwide.
  • Financiers and investorsSite risk, policy and support in one index, with sources.
  • Private operatorsFind the next site for a new hall or campus.
  • Public operatorsShortlist sites for sovereign AI and research facilities.
Inside the tool

Every site and every candidate location, rated from open data

The screens below are from the working tool. Each figure comes from a public source and links to it.

18categories in the 0–10 rating of any location
2,900candidate sites in 190 countries to filter
132countries, US states and Canadian provinces with datacenter support rules
5best sites from any region you draw, up to 20,000 km²
01 The area around each site

25 miles around every site: grid, talent, competitors and people

A map of the area around each site shows what makes the location work, and the engine explains why the site sits there, ranked against the rest of the portfolio.

  • Power lines by voltage, substations and the nearest transmission tap-in
  • Universities, other datacenters, energy supplier offices and population density
  • Talent, grid access, power price and free cooling compared across all sites
Cyclops location map: 25 miles around a Frankfurt site with power lines by voltage, transmission tap-ins, universities, other datacenters, energy supplier offices and population pockets, next to the reasons the site sits there
The grid, universities, competitors and people within 25 miles, and why the site sits there.
02 Site intelligence

Rate any location for a new datacenter, from 0 to 10

Enter a country, city and postcode. The tool maps 50 miles around the place, collects open data and scores it in 18 weighted categories, showing every figure and its source. A lookup runs in the background and takes one to six minutes.

  • Power and climate: grid access, energy prices, renewable mix, free-cooling days and the climate trend
  • People and policy: rule of law, datacenter policy, tax, talent, suppliers, salaries, contentment and public acceptance of new datacenters
  • Government support: incentives and restrictions for datacenters in 132 countries, US states and Canadian provinces, each linked to its law or agency page
  • Risk and land: natural hazards and water, property prices and development
  • Compare up to three locations side by side and export the comparison as one PDF; every analysis stays on a world map of past results
Cyclops site intelligence: the history of past analyses as pins on a world map, the assessment form, Frankfurt am Main rated 7.5 out of 10 and the map of 50 miles around it, with tabs for Assess, Compare, Area study and Explore on the right
One location assessed, past analyses on a world map, and a tab for each tool.
Cyclops comparison of Oslo, Frankfurt am Main and Dublin: overall scores 8.7, 7.5 and 7.2, a summary sentence and a bar for each category, with the highest score marked
Three locations compared category by category, exported as one PDF.
03 Explore worldwide

Narrow 2,900 candidate sites in 190 countries down to a shortlist

Every town and city of 50,000 people or more has a quick profile from worldwide open data. Filters narrow them step by step, each showing how many sites it would leave. Pick up to three on the map and the tool runs the full assessment of each and compares them.

  • Power available nearby, free-cooling days, interconnection, technical talent, build cost and electricity price
  • Electricity mix, political stability, government effectiveness, regulatory quality, corruption control, policy continuity, innovation and HDI
  • Government support, restrictions on new datacenters and opposition in the national news
Cyclops explore view: filters by country, power, climate, cost, people and governance on the left; a map of matching candidate sites coloured by screening score and cards for Oslo, Dusseldorf, Cologne and Wuppertal
71 candidate sites in three countries, filtered and ranked by a screening score.
04 Area study

Draw a region, get the five best sites in it

Draw an area of up to 20,000 km² on a regional map. The tool screens a grid of points for grid access, datacenters nearby, people and universities within reach and setback from large towns, picks up to five sites apart from each other, assesses each in full and ranks them.

  • Up to 400 points screened in each area, using the same open data as the full assessment
  • Candidates kept apart, so each is a different place, and never at sea
  • The area, the ranking, the comparison and every candidate in one PDF
Cyclops area study west of Frankfurt: a drawn area with screened points coloured by score and five numbered candidate sites
672 km² screened in 400 points; five candidates, numbered by rank.
Cyclops area study ranking: Bad Soden am Taunus, Niedernhausen, Rüsselsheim am Main, Kelsterbach and Mörfelden with their index, band and screening score
The candidates ranked by their full assessment.
Where it fits

The first step in the datacenter lifecycle

Site intelligence covers site selection. The same data then feeds what-if assessments, pricing and billing.

  1. 01Site selectionRate and compare locations worldwide
  2. 02What-if assessmentTest prices, demand and contracts first
  3. 03ExpansionFind where capacity runs short and what to add
  4. 04Energy meteringFacility and IT energy, hour by hour
  5. 05ESG complianceEED, CSRD and certification data
  6. 06Unit pricingEach GPU-hour and token priced above its cost
  7. 07MonetizationUsage billed, invoiced and collected

Optimize pricing optimization and site intelligence Report ESG reporting Monetize datacenter monetization

Rate your next location

Tell us which countries or regions you are considering and how much power you need. We will run a site study with you in the live tool.